November 15, 2023 -Vancouver, B.C., Canada; Belmont Resources Ltd. (“Belmont” or the “Company”) (TSX.V: BEA; FSE: L3L2) is pleased to announce that TSX Venture Exchange has accepted for filing documentation with respect to a $420,000 convertible loan from arms length parties.
The convertible debenture bears no interest before April 1, 2024. Interest on arrears of 12.0% per annum will begin to accrue starting April 2, 2024, if the principal amount is not paid in full on April 1, 2024. Interest is payable in cash, anything else will be subject to TSXV approval.
The Lenders have the option to have the Debt paid through the issuance of 14,000,000 common shares, at a deemed value of $0.03 per share, subject to the approval of the TSX Venture Exchange
About Belmont Resources
Belmont Resources has assembled a portfolio of highly prospective copper, gold, lithium, uranium and rare earths projects located in British Columbia, Saskatchewan, Washington and Nevada States. Its holdings include:
- Athelstan-Jackpot (A-J): 2 former gold mines. 2,000m drill program recently completed (see
- Crackingstone Uranium-Rare Earths: Some of the highest grade Rare Earth Elements (REE’s) are being discovered in Northern Saskatchewan due to the presence of Uranium, Thorium & Pegmati Crackingstone project meets the criteria for potentially discovering a large REE’s deposit with its high grade uranium along with thorium and pegmatite. A review of 3,000m of 2008 drill data shows a 1.3km pegmatite dyke drilled but only assayed for uranium at that time. 2023 plans are to re-assay pegmatite sections for REE’s ;
- Come By Chance (CBC): 2021 geophysics delineated potential large copper-gold porphyry;
2022 drilling provided further vectors towards potential core of porphyry
- The Lone Star Copper-Gold: optioned to Australian Marquee Resources ASX:MQR. MQR has spent in excess of $2.5M in drilling, completed new resource in Dec. 2022, and is currently preparing a Preliminary Economic Assessment in order to earn 80% interest.
- The Kibby Basin Lithium project located 60 kilometers north of the lithium rich Clayton Valley Basin: Optioned 80% of the central Kibby Playa claim block to Australian Marquee Resources – MQR. MQR has spent in excess of $2.5M in drilling in 2022 for potential deep seated lithium brine. 2022 Drilling confirmed high levels of lithium-bearing sediments along with dissolved lithium in the groundwater. Mineralized intervals containing up to 924 ppm lithium with greater than 300 ppm lithium over thicknesses in excess of 450m have been identified in core samples of clay-rich playa sediments

ON BEHALF OF THE BOARD OF DIRECTORS
“George Sookochoff”
George Sookochoff, CEO/President
Ph: 604-505-4061
Email: george@belmontresources.com
Website: www.BelmontResources.com
Neither the TSX Venture Exchange nor its Regulation Services Provider (as the term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.